Skip to content
Aquamax
Menu

Sectors

The method is the same everywhere. What changes is the thing that must survive it, and the length of the window we are given to get it done.

The plant is only available when it is off

Generation, geothermal, refining and gas. The date the unit comes back is set before anyone walks on site, and everything we do is measured against it.

Contact Energy · Genesis Energy · Shell Todd · Marsden Point · Fitzroy

The lane goes back at daylight

Markings, surface and structure on live carriageway. The work is done inside a traffic management plan, at night, and the closure is the constraint on everything else.

Downer · Fulton Hogan · Higgins

Take the concrete, leave the steel

Repair, profiling and preparation on structures that are staying. The reinforcing is usually the reason we are on site rather than a breaker gang.

Hawkins · Naylor Love · Fletcher Construction · FCC · Concrete Solutions · Contech

Between sailings, over water

Decks, wharves, ramps and vessel steel. The berth is worth more than the job, so the work is sized to the gap in the shipping schedule.

Babcock · Interislander · Port of Napier

Aviation

3 services

Alloy that has to stay the shape it is

Runway, taxiway and airframe. Two different jobs with the same constraint: the surface underneath is the asset and it does not get touched.

The factory next door keeps running

Coating removal, plant cleaning and floor preparation inside operating sites, where the work has to be contained rather than fenced off.

NSB Protective Coatings · Enhance Roof Coatings · NIWWA

Call 0800 278 2629